Khurais Gas & Oil Separation Plant

The Khurais project as a whole covers three oilfields: Khurais, Abu Jifan and Mazalij. Throughout this region there are numerous gas oil separation plants (GOSPs), which provide the initial separation of water and gas from the oil prior to shipment to Abqaiq for further processing.

GAMA Industry provided civil, infrastructure, structural, architectural, electromechanical erection works of gas and oil separation plant and make it ready for commissioning.

Kashagan Main Works – Tranche 3

The project is construction of Main Pipe Rack for Tranche 3, Oil Processing Unit for Tranche 3 and Gas Compression Unit 361 of Petroleum Process Facility under Kashagan Field Development Project – Experimental Program.

Scope of project is; supply of all civil works materials, paint, insulation, support and all consumables, execution of civil works, construction of industrial buildings, fabrication and erection of steel structures, prefabrication of piping spools and installation, installation of equipment, electrical and instrumentation works, painting and insulation works.

This project is undertaken and executed by GATE İnşaat Taahhüt San. ve Tes. A.Ş. a subsidiary of GAMA with %50 share.

Kashagan Industrial Buildings

The project is construction of process buildings of petroleum process facility under Kashagan Field Development Project – Experimental Program.

Scope of project is; engineering, supply of all civil works materials and all consumables, execution of civil works, construction of industrial buildings, fabrication and erection of steel structures, prefabrication of piping spools and installation, installation of equipment, painting and insulation works of fire station building, center control room, laboratory, mechanical workshop, electrical and instrumentation workshop, warehouse (2 ea), temporary refuges (2 ea.), gate house and change room.

This project is undertaken and executed by GATE İnşaat Taahhüt San. ve Tes. A.Ş. a subsidiary of GAMA with %50 share.

Kashagan Main Works – Tranche 1 & 2

The project is construction of main pipe rack, oil process units and gas compression unit for tranche 1 and 2 of petroleum process facility under Kashagan Field Development Project – Experimental Program.

Scope of project is supply of all civil works materials, paint, insulation, support and all consumables, execution of civil works, construction of industrial buildings, fabrication and erection of steel structures, prefabrication of piping spools and installation, installation of equipment, painting and insulation works.

This project is undertaken and executed by GATE İnşaat Taahhüt San. ve Tes. A.Ş. a subsidiary of GAMA with %50 share.

Berri Gas Plant Qatif Facilities

GAMA Industry performed construction of new production facilities and revamping of existing facilities including civil and mechanical works.

Western Libya Gas Project – Wafa Coastal Plant

GAMA Industry performed engineering, procurement and construction of 31 buildings with a total area of 28,600 square meters and execution of complete civil and mechanical installation works for the process, utility, underground and off-site areas of the WAFA Gas Plant.

Tomskneft Luginetsky Gas Compressor Station

Luginetsky Gas Compressor Sation is located in a remote area, about 500 km north of Tomsk city in Western Siberia. Ambient temprature varies from +36 C during summer to -55 C in winter time. The station is planned to seperate, compress and dehydrate the associated gas from the Luginetsky oil field.

The maximum anticipated output gas capacity is about 4.3 Mm3 /day. There are two 14 MW gas turbine driven centrifugal compressors in the main station. A booster compressor station, which is, located 1.6 km away feeds the gas to the main station by two screw compressors driven by electric motors.

Hawiyah Gas Plant

The gas to be treated at Hawiyah Gas Plant arrives to the Plant through gas manifolds and trunk lines. The treated gas is then given to gas pipeline grid system.

GAMA Industry executed two contracts is the mechanical erection works package of Utility and Sulphur Recorvery units of Hawiyah Gas Plant.

The scope covers the construction of 23 buildings, plant foundations, underground RTR piping works and other related works for the first contract. Within the context of the second contract a utilities area (covering steam, instrument air, nitrogen, fire water, utility water, demin-water, etc.), a sulphur recorvery area where the hydrogen sulfide (H2S) in the gas in converted into hydrogen (H2) and molten sulphur (S4), a sulphur loading area (tanks ans loading facilities) and other areas (fire training etc.), are included.

3×16 MW Tarutino Compressor Station

Turnkey construction of 48 MW compressor station, which increase the pressure of gas from 50 bar to 75 bar by means of which 3.9 billion m3 per year additional capacity is executed.

In addition to main compressor buildings, construction of administrative and control building, gas filling station, fuel stores, gas/diesel electric stations, accumulator building, boiler house and pump station, storages, social facilities, water cleaning unit and 2 water wells as well as electrical and automation works were included in the project.

This project has been executed by GAYES – GAMA Renewable Energy Systems Construction Corp. (formerly Transbalkan A.S.), a subsidiary of GAMA Industry Inc.