Kaluga Electro Steel Melting Complex

Kaluga Electro Steel Melting Complex Project is realized as a “Greenfield Project” by GAMA Industry Inc.

The complex, which has been working in normal manufacturing regime since August 2013, can handle 2 million ton of scrap iron and produce 1 million ton of reinforcing steel bars and hot rolled profiles annually.

The Project, which has quite big volume of works with main items of 2,000,000 m3 earthworks, 120,000 m3 concrete, 45,000 ton structural steel and 10,000 ton equipment erection,  consists of electric arc and ladle furnaces, 8-strand caster, billet handling and storage facilities, de-dusting plant, water treatment plants, scrap yard, material preparation plant and other auxiliary units.

Vyksa Casting Rolling

GAMA Industry performed civil construction, structural steel erection, equipment installation, pipe prefabrication and piping, painting and insulation works for the process buildings, infrastructure, transformer station, finishing works, electrical and instrumantation installation works, landscaping and roads construction, cold tests and commissioning works of the 1,200,000 ton/year capacity Vyksa Casting Rolling Plant.

Hadeed II Direct Reduction Plant

GAMA Industry performed mechanical erection, partial material supply and instrumentation of 1,240,000 tpy capacity Direct Reduction Plant based on 93% metallisation of DRI.

Copper / Zinc Beneficiation Plant

GAMA Industry performed turnkey construction of the surface facilities for the copper/zinc beneficiation plant including partial basic and detail engineering and local equipment/material supply.

Iron Ore Concentration Plant

Turnkey construction of the 670 ton/hr Iron Ore Concentration Plant including the thickener systems, turbo screens, magnetic separators, feeders and conveying system, pumps, compressors.