2×35 MW Kashagan Natural Gas Fired Simple Cycle Power Plant

2×35 MW Natural Gas Fired Simple Cycle Power Plant is implemented on a turnkey basis.

The Power Plant provides electrical power to be used by the onshore processing facility. The equipments are mainly;  2 nos GE 6B Gas Turbines, 3 nos Essential Diesel Generators, Power Generation Building, Essential Diesel Generator Building, Step up Transformers, 35/10/0,7/0,4 kV Switchgears and DCS.

This project is undertaken and executed by GATE İnşaat Taahhüt San. ve Tes. A.Ş., a subsidiary of GAMA with %50 share.

Kashagan Main Works – Tranche 3

The project is construction of Main Pipe Rack for Tranche 3, Oil Processing Unit for Tranche 3 and Gas Compression Unit 361 of Petroleum Process Facility under Kashagan Field Development Project – Experimental Program.

Scope of project is; supply of all civil works materials, paint, insulation, support and all consumables, execution of civil works, construction of industrial buildings, fabrication and erection of steel structures, prefabrication of piping spools and installation, installation of equipment, electrical and instrumentation works, painting and insulation works.

This project is undertaken and executed by GATE İnşaat Taahhüt San. ve Tes. A.Ş. a subsidiary of GAMA with %50 share.

Kashagan Industrial Buildings

The project is construction of process buildings of petroleum process facility under Kashagan Field Development Project – Experimental Program.

Scope of project is; engineering, supply of all civil works materials and all consumables, execution of civil works, construction of industrial buildings, fabrication and erection of steel structures, prefabrication of piping spools and installation, installation of equipment, painting and insulation works of fire station building, center control room, laboratory, mechanical workshop, electrical and instrumentation workshop, warehouse (2 ea), temporary refuges (2 ea.), gate house and change room.

This project is undertaken and executed by GATE İnşaat Taahhüt San. ve Tes. A.Ş. a subsidiary of GAMA with %50 share.

Kashagan Main Works – Tranche 1 & 2

The project is construction of main pipe rack, oil process units and gas compression unit for tranche 1 and 2 of petroleum process facility under Kashagan Field Development Project – Experimental Program.

Scope of project is supply of all civil works materials, paint, insulation, support and all consumables, execution of civil works, construction of industrial buildings, fabrication and erection of steel structures, prefabrication of piping spools and installation, installation of equipment, painting and insulation works.

This project is undertaken and executed by GATE İnşaat Taahhüt San. ve Tes. A.Ş. a subsidiary of GAMA with %50 share.

238 MW Kashagan Combined Cycle Power Plant

Execution of all civil works, steel structure, mechanical, electrical erection, piping, instrumentation, painting and insulation works of 238 MW natural gas fired combined cycle power plant composed of 4×42 MW gas turbines and 2×35 MW steam turbines for the power supply for Trench 1 and 2 of Kashagan Petroleum Area.

This project is undertaken and executed by GATE İnşaat Taahhüt San. ve Tes. A.Ş., a subsidiary of GAMA with %50 share.

Atyrau Refinery Reconstruction

Construction of additional units (gasoline, diesel, sulfur, hydrogen, coker) and renovation works for the Atyrau Refinery is implemented.

Civil construction works, structural steel works, mechanical works, piping works, electric and instrumentation works, insulation, painting and fire proofing works are performed by GATE (a subsidiary of GAMA with %50 share) as subcontractor to JGC.