200 MW Hartha Thermal Power Station Rehabilitation – Unit 1

Hartha Unit-1 Rehabilitation project consists of rehabilitation of instruments and control system of turbine and boiler, rehabilitation of generator and electrical equipments, rehabilitation of boiler runs on 4 types of fuel, rehabilitation of turbine and increase the output of generator to its original value 200 MW and extend the lifetime of the boiler, turbine and generator to 10 years.

750 MW Boufarik Simple Cycle Power Plant

EPC Contract for Boufarik 750 MW Simple Cycle Power Plant is undertaken on a turnkey basis.

GAMA Power Systems undertakes the responsibility of supply and erection of 3 GE 9FA gas turbines, main equipments as well as HV switchyard and all balance of plant equipments and spare parts including basic & detail design of the power plant, civil works, structural, electromechanical works erection, installation of electrical, instrumentation & control systems, test and commissioning, start-up works and training of the Employer’s personnel.

With its completion the plant will generate energy around 4,000 GWh per year which will have a significant contribution to energy production in Algeria and provide electricity to more than 1 million dwellings by improving energy security in the country.

Kocaeli Integrated Health Campus Project

Ministry of Health of Republic of Turkey awarded the Contract of the Construction of Kocaeli Integrated Health Campus and Provide Goods and Services Project, tendered as part of PPP (Public-Private Partnership) projects, to Kocaeli Hospital Investment and Health Care Services Inc.

Kocaeli Hospital Investment and Health Care Services Inc. (SPV) and GAMA-Türkerler Joint Venture have signed the EPC Contract. Project is constructed over a 368,668 m² land consisting of several hospitals with a total enclosed area of 335,648 m² and a bed capacity of 1,180.

The health campus is going to include three hospital buildings which are Main Hospital, Physical Therapy and Rehabilitation Hospital and High Security Forensic Hospital and one Technical Service building.

450 MW Rades C Combined Cycle Power Plant

EPC Contract for 450 MW Rades C Combined Cycle Power Plant is undertaken on a turnkey basis.

GAMA Power Systems scope includes; supply of RMS (Reducing and Measuring System), Gas Compressor, Auxiliary Boiler, Liquid Fuel System, Desalination System, Water Treatment Plant, Fire Fighting and Detection System, Transformers, By-pass Stack and in addition to this scope design of all buildings and related infrastructures is under the scope of GAMA. All procurement, design, civil and electromechanical construction-assembly and commissioning works related to these equipments are to be carried out by GAMA.

The increased power demands in Tunisia, with its completion the plant will make a big contribution.

Izmir Bayrakli Integrated Health Campus

Ministry of Health of Republic of Turkey awarded the Contract of the Construction of Izmir Bayrakli Integrated Health Campus and Provide Goods and Services Project, tendered as part of PPP (Public-Private Partnership) projects, to Izmir Bayrakli Hospital Investment and Health Care Services Inc. on September 06, 2014.

EPC Contract has been signed between Izmir Bayrakli Hastane Yatirim ve Sağlik Hizmetleri A.Ş. (SPV) and Türkerler-GAMA JV.

Project is constructed over a 573,547 m² land and the bed capacity is 2,060. The health campus is going to include three hospital buildings which are Main Hospital, Physical Therapy and Rehabilitation Hospital and High Security Forensic Hospital and one Technical Service building.