Ballincollig By-Pass Project
Phase I: Construction of 12.6 km of new road built as dual carriageway and 1.2 km of new and widened road built as a 10 m wide single carriageway, which form the N18 Eastern Bypass. Construction of 2.5 km of new road built as dual carriageway and 4.6 km of new road built as single carriageway, which form the N85 Western Relief Road, construction of 3 grade separated junctions including ramps on the N18 Eastern Bypass and 6 roundabout junctions on the N85 Western Relief Road, construction of 10 major new structures, including 5 underpasses and 4 overpasses side road diversions with 10 km of new link roads to existing roads, construction of 60 km drainage, fencing, ducting, watermains, lighting, signs and road markings, all in European Union Standards.
Phase II: Bandon Road Roundabout Advance Works include the widening of the Bandon Road roundabout carriageway, construction of the eastbound exit ramp from Ballincollig Bypass to Bandon Road Roundabout, Heiton-Buckley’s two-way link road, the westbound ramp from Bandon Road Roundabout to Ballincollig Bypass and remodelling of the Dunnes Stores Bishopstown shopping centre public road access and widening of the N71 for app.240m.
This project is executed by GAMA Construction Ireland Ltd.