157 MW Kangal Thermal Power Plant Extension Unit-III and Flue Gas Desulphurization Plant
Turnkey construction of a single unit extension to the plant consisting of a lignite fired steam boiler and turbine-generator set (157 MW electric power capacity), Coal Handling System, Flue Gas Desulphurization Plant, Raw Water Supply System and Water Treatment Plant is implemented.