157 MW Kangal Thermal Power Plant Extension Unit-III and Flue Gas Desulphurization Plant, Turkey

157 MW Kangal Thermal Power Plant Extension Unit-III and Flue Gas Desulphurization Plant

Turnkey construction of a single unit extension to the plant consisting of a lignite fired steam boiler and turbine-generator set (157 MW electric power capacity), Coal Handling System, Flue Gas Desulphurization Plant, Raw Water Supply System and Water Treatment Plant is implemented.

Location Icon
Location

Kangal, Turkey

Client Icon
Client

Turkish Electricity Generation and Transmission Corporation / Turkey

Contractor Icon
Contractor

Consortium of Transelektro Ltd., Mitsubishi Heavy Industries, Siemens A.G., Simko Ticaret Sanayi A.S. Koch Transporttechnik and GAMA Industru Inc.

Duration Icon
Project Duration

48 Months (June 1996 - June 2000)