2×25 MW Eregli Thermal Power Plant Erection of two 30 MW steam generators, 30 MW turbo generator and 20 MW turbo blower. Location Eregli, Turkey Client Eregli Iron and Steel Works - Kdz.Eregli / TURKEY Contractor GAMA Industry Inc. Project Duration 20 Months (August 1975 - April 1977)