2×35 MW KASHAGAN NATURAL GAS FIRED SIMPLE CYCLE POWER PLANT

2×35 MW Kashagan Natural Gas Fired Simple Cycle Power Plant

2×35 MW Natural Gas Fired Simple Cycle Power Plant is implemented on a turnkey basis.

The Power Plant provides electrical power to be used by the onshore processing facility. The equipments are mainly;  2 nos GE 6B Gas Turbines, 3 nos Essential Diesel Generators, Power Generation Building, Essential Diesel Generator Building, Step up Transformers, 35/10/0,7/0,4 kV Switchgears and DCS.

This project is undertaken and executed by GATE İnşaat Taahhüt San. ve Tes. A.Ş., a subsidiary of GAMA with %50 share.

Location Icon
Location
Kashagan, Kazakhstan
Client Icon
Client
AGIP Kazakhstan North Caspian Operating Company N.V.
Contractor Icon
Contractor
GATE İnşaat Taahhüt Sanayi ve Tesisat A.Ş (Joint Venture of GAMA Industry)
Duration Icon
Project Duration
37 Months (September 2009 - November 2012)