36.4 MW Lamas Run of River Hydroelectric Power Plant

EPC Contract for 36.4 MW Lamas Run of River Hydroelectric Power Plant is undertaken on a turnkey basis.

With the altitude of 654 m – 80 m, run of the river type hydroelectric power plant project has 2×7.39 MW and 2×10,81 MW pelton turbines.

Location Icon
Location
Erdemli, Mersin, Turkey
Client Icon
Client
TGT Elektrik Üretim A.Ş. (a subsidiary of GAMA Enerji)
Contractor Icon
Contractor
GAYES (GAMA Renewable Energy Systems Construction Co.)
Duration Icon
Project Duration
24 Months (June 2007 - June 2009)