36.4 MW Lamas Run of River Hydroelectric Power Plant, Turkey

36.4 MW Lamas Run of River Hydroelectric Power Plant

EPC Contract for 36.4 MW Lamas Run of River Hydroelectric Power Plant is undertaken on a turnkey basis.

With the altitude of 654 m – 80 m, run of the river type hydroelectric power plant project has 2×7.39 MW and 2×10,81 MW pelton turbines.

Location Icon
Location

Erdemli, Mersin, Turkey

Client Icon
Client

TGT Elektrik Üretim A.Ş. (a subsidiary of GAMA Enerji)

Contractor Icon
Contractor

GAYES (GAMA Renewable Energy Systems Construction Co.)

Duration Icon
Project Duration

24 Months (June 2007 - June 2009)