4×360 MW Afsin Elbistan B Thermal Power Plant
Construction of 4×360 MW conventional type lignite fired Power Plant on turn-key basis, including all ancillary units and the flue gas desulphurization plant.
GAMA – Tekfen – Tokar JV (GAMA is the leader with its 40% share) is responsible for the construction and erection of boilers and bunkers, coal stock yard and coal handling system, stacks (2 each, 150 m), flue gas desulphurization plant, storm water system, roads, walkways, fencing and auxiliary buildings (workshop, warehouses, mill repairshop, operation building, cafeteria) of the plant.