6×165 MW SOMA-B THERMAL POWER PLANT

6×165 MW Soma-B Thermal Power Plant

The Soma-B Power Plant consisting of six coal-fired production units and auxiliary systems, was constructed on a turn-key basis and in three stages as follows:

  1. Stage: Construction of 2×165 MW Units 1 & 2
  2. Stage: Construction of 2×165 MW Units 3 & 4, including ash dam and hydraulic transport system
  3. Stage: Construction of 2×165 MW Units 5 & 6

Location Icon
Location
Manisa, Turkey
Client Icon
Client
Turkish Electricity Authority (TEK) / Turkey
Contractor Icon
Contractor
Stage 1: Skodaexport (Czech Rep.), Metex (Fin.), GAMA ·Stage 2: Skodaexport - GAMA ·Stage 3: Skodaexport - GAMA
Duration Icon
Project Duration
Stage 1: 60 Months (June 1977 - May 1982) Stage 2: 55 Months (July 1981 - Jan. 1986) Stage 3: 56 Months (Jan. 1987 - Oct. 1991)