Ain-Ghazal Waste Water Immediate Relief Pipeline, Jordan

Ain-Ghazal Waste Water Immediate Relief Pipeline

Turnkey construction of a Waste Water Treatment Plant including sewage decomposing unit, 220 hectares of waste stabilisation and emergency ponds, 40 km long 50” diameter pipeline including cathodic protection, 4 km long access roads, waste collection and pretreatment system, odour control system, 110 kg/hr automatic chlorination system and maintenance facilities.

Location Icon
Location

Amman, Jordan

Client Icon
Client

Water Authority of Jordan

Contractor Icon
Contractor

GAMA Industry Inc.

Duration Icon
Project Duration

39 Months (May 1983 - August 1986)