1,200 MW Hamitabat Combined Cycle Power Plant, Turkey

1,200 MW Hamitabat Combined Cycle Power Plant

EPC Contract for Hamitabat 1200 MW Natural Gas Combined Cycle Power Plant is implemented on a turnkey basis.

The Plant is comprised in two units. Each unit is based on a single-shaft configuration, comprising of one gas turbine, one steam turbine, one generator (SGT5-8000H Gas Turbine, SST5-5000 Steam Turbine, SGen5-3000W Generator) and one Heat Recovery Steam Generator. The units are utilizing the existing dry cooling towers as a part of cooling system. Electricity is transferred to the grid via the existing substation which was refurbished.

EPC Contract’s scope covers procurement of all major equipment as well as other auxiliary equipment and conceptual and detail engineering of the plant, civil and electro-mechanical installation works, test and commissioning works, and training of the Employer’s staff.

Location Icon
Location

Kırklareli, Turkey

Client Icon
Client

HAMITABAT Elektrik Üretim ve Ticaret A.Ş. (LIMAK)

Contractor Icon
Contractor

GAMA Power Systems Inc.

Duration Icon
Project Duration

28 Months Unit 1 (April 2015 - August 2017), 32 Months Unit 2 (April 2015 - November 2017)