1800 MW ALBA LINE 6 EXPANSION, POWER STATION 5

1800 MW ALBA Line 6 Expansion, Power Station 5

EPC Contract for 1800 MW ALBA Line 6 Expansion, Power Station 5 Project is undertaken on a turnkey basis.

The Project scope consists of engineering, procurement and construction of three GE 9 HA.01 Gas Turbines and three GE A650 Steam Turbines with 1x1x1 multishaft configuration. GAMA Power Systems is responsible for engineering and procurement of all BOP systems and overall construction works. Commissioning scope is limited with Consortium members’ own scope of supply systems only.

With the investment of the largest and most efficient power plant in Bahrain; 1800 MW Combined Cycle Power Plant project, Employer Aluminium Bahrain B.S.C. (ALBA), targets to provide energy for the new “Smelter Expansion” project as well as development of the current power supply units with the new technology gas turbines providing higher efficiency. The energy to be provided to the new “Smelter Expansion” project will lead ALBA to be the largest aluminium smelter in the world.

Location Icon
Location
Manama, Bahrain
Client Icon
Client
Aluminium Bahrain B.S.C. (ALBA)
Contractor Icon
Contractor
Duration Icon
Project Duration
42 Months (August 2016 - February 2020)