38 MW Ayen Combined Cycle Power Plant, Turkey

38 MW Ayen Combined Cycle Power Plant

GAMA Power Systems performed turnkey design, supply and construction of a natural gas fired combined cycle power plant, comprising GE (USA) LM2500 PY+DLE double shaft aeroderative gas turbine, Thermodyn (France) steam turbine and Aalborg Engineering (Denmark) HRSG (generating 30 tons/hr of high pressure and 7 tons/hr of low pressure steam), including all auxiliary components.

Location Icon
Location

Ankara, Turkey

Client Icon
Client

AYEN Ostim Enerji Otoprodüksiyon San. ve Tic. A.Ş. / Turkey

Contractor Icon
Contractor

GAMA Power Systems Inc.

Duration Icon
Project Duration

21 Months (December 2002 - August 2004)