Akenerji Bozuyuk Power Plant Heat Recovery Steam Generators Two sets of HRSG (behind Frame 6 gas turbine) design, supply and construction Location Bozuyuk, Turkey Client Akenerji Elektrik Uretim A.S. Contractor Babcock&Wilcox GAMA Boiler Technology Inc. Project Duration 21 Months (January 1996 – September 1998)