ENERJİSA Adana Combined Cycle Power Plant – Auxiliary Steam Boiler and BoP System

Supply and installation of Enerjisa Adana Combined Cycle Power Plant auxiliary steam boilers and turn key basis supply belongs to these systems.

Location Icon
Location

Adana, Turkey

Client Icon
Client

Enerjisa Enerji Uretim A.S.

Contractor Icon
Contractor

GAMA Power Systems Inc.

Duration Icon
Project Duration

24 Months (December 2001 - December 2003)