ENERJISA Izmit Combined Cycle Power Plant – HRSG & Steam Boiler Project

One ea. HRSG (behind Frame 6 gas turbine), one ea. FM-120/97 and FM-103/88 natural gas and oil fired boiler design, supply and construction and existing HRSG modification.

Location Icon
Location

Izmit, Turkey

Client Icon
Client

Enerjisa Enerji Uretim A.S. (Izmit)

Contractor Icon
Contractor

Babcock&Wilcox GAMA Boiler Technology Inc.

Duration Icon
Project Duration

20 Months (February 1999 - November 2000)