Entek Izmit Cogeneration Plant HRSG

Turnkey EPC project for installation of two pressure HRSG behind GE LM6000 PC Sprint type Gas Turbine and by-pass stack at İzmit Electric Power Generation Plant.

Pressure and output of HRSG; HP: 55 bara/14,5 ton/hr.

Location Icon
Location

Izmit, Turkey

Client Icon
Client

Entek Elektrik Uretimi Otoproduktor Grubu A.S.

Contractor Icon
Contractor

GAMA Power Systems Inc.

Duration Icon
Project Duration

14 Months (August 2004 - October 2005)