Erdemir-Erenco Cogeneration Power Plant – HRSG Modification
Modification of 2 existing HRSG, were erected by BWG in 1997, by adding a new HP two pressure level for steam generation.
Project is completed 45 days before the date on the contract.
Modification of 2 existing HRSG, were erected by BWG in 1997, by adding a new HP two pressure level for steam generation.
Project is completed 45 days before the date on the contract.
Karadeniz Eregli, Turkey
Erdemir – Erenco
GAMA Power Systems Inc.
18 Months (February 2004 - August 2005)