Surgut 800 MW Combined Cycle Power Plant, Russian Federation

Surgut 800 MW Combined Cycle Power Plant

EPC Contract for Surgut 800 MW Combined Cycle Power Plant is implemented on a turnkey basis.

GE International Inc.(GEII) – GAMA Power Systems Consortium constructed two 109FA 50Hz Single-Shaft configured Power Plant, comprised of one GE 9FA gas turbine, one GE D10 steam turbine, one GE 390H generator, a horizontal three-pressure level CMI Heat Recovery Steam Generator, plus balance of plant equipment necessary for the plant’s operation.

EPC Contract’s scope covers procurement of all major equipment as well as other auxiliary equipment, and conceptual and detail engineering of the plant, civil and electro-mechanical installation works, test and commissioning works and training of the Employer’s staff.

Location Icon
Location

Surgut, Russian Federation

Client Icon
Client

OGK-4

Contractor Icon
Contractor

GEII - GAMA Power Systems Consortium

Duration Icon
Project Duration

44 Months (November 2007 - June 2011)