TAI HEATING PLANT (ADDITIONAL UNIT) AND AUXILIARY EQUIPMENT

Tai Heating Plant (Additional Unit) and Auxiliary Equipment

One set of FM 103/79 type,natural gas and fuel oil fired, 20 t/hr. package boiler design, supply and construction

Location Icon
Location
Ankara, Turkey
Client Icon
Client
Tusas Havacilik ve Uzay Sanayi A.S.
Contractor Icon
Contractor
Babcock&Wilcox GAMA Boiler Technology Inc.
Duration Icon
Project Duration
19 Months (May 1992 – December 1993)