TUPRAS 10F/105A Steam Boiler Retubing Works
Re-tubing and repair of pressure and non pressure parts of 10F-105A Steam Boiler in Tupras Refinery in Izmit. This boiler was originally built in 1997 by GAMA and had suffered an extensive damage due to an accident on February 2006.