Khurais Gas & Oil Separation Plant

The Khurais project as a whole covers three oilfields: Khurais, Abu Jifan and Mazalij. Throughout this region there are numerous gas oil separation plants (GOSPs), which provide the initial separation of water and gas from the oil prior to shipment to Abqaiq for further processing.

GAMA Industry provided civil, infrastructure, structural, architectural, electromechanical erection works of gas and oil separation plant and make it ready for commissioning.

1800 MW PP13 Combined Cycle Power Plant

Installation of Power Island ME&I and Equipment at 1800 MW Power Plant PP13 is undertaken by GAMA Power Systems as construction contractor.

Project Scope consisted of electromechanical installations, pre-commissioning of 6 ea 7FA Gas Turbine, associated Generator and Heat Recovery Steam Generator (HRSG), 6ea. 2ea GE Reheat Double Flow D11 type Steam Turbine, 5ea Generator Step-Up Transformers (GSU), 2ea Air Cooled Condenser Units (each of the units consisted of 42 cells), and installation of Balance of Plant works together E&IC as well as the Process Buildings. In addition, the EPC responsibility of 380 kV GIS Unit as turnkey basis, i.e. engineering, procurement, installation and commissioning of GIS was under GAMA’s scope.

The project is completed within the scope agreed with the Employer in October 2019.

Ma’aden Sulphuric Acid Plant

The project, consists of 4 main sections; 3 sulphuric acid production plants, each with the capacity of 5,000 tons/day, and a common part serving to these 3 plants, is undertaken by GAMA Industry Arabia Ltd.

3×600 MW Shoaiba IWPP Phase-3

Mechanical erection of 3×600 MW boilers, 3 pcs. electrostatic filter, 1 pcs. ash handling system and 1 pcs. auxiliary boiler including paint touch-up works are implemented.

Tasnee Polyethylene Plant

Construction, structural steel, equipment and piping installation works for the LDPE/HDPE Plant in Jubail city of Saudi Arabia is subcontracted to GAMA Industry Arabia Ltd. by the main contractor Tecnimont Arabia Ltd.

Rabigh Cement Plant Expansion

GAMA performed construction of a new clinker production line with a capacity of 7,000 tons/day starting from and including the new limestone crusher up to and including the packing and bulk loading plant as well as construction work for new power plant and connection to existing lines.

Petro Rabigh Polyethylene Plant, PC1 – PE Plants

GAMA performed civil construction, structural steel erection, equipment installation, pipe prefabrication and erection, painting and insulation works for the two reactor buildings, process buildings, extrusion building, powder & pellet silo structures & silos, infrastructure, transformer stations and the other auxiliary buildings of the two polyethylene plants which are EPPE (Easy Process Polyethylene) and LLDPE (Linear Low Density Polyethylene) having production capacity of 250,000 Ton and 350,000 Ton per year respectively.

This project is undertaken by GAMA Industry Arabia Ltd.

Yamama Cement Plant – Line No.7

GAMA Industry performed turnkey construction of Yamama Cement Production Line No.7 with 10,000 tonnes/day clinker capacity at the existing cement plant facilities, within the scope of “Sales & Purchase Contract” and “Construction & Erection Contract”, including the construction of a new cement mill unit for the existing Line No.6 .

At the time, world’s biggest cement plant; Yamama Cement Plant is executed by GAMA Industry Arabia Ltd.