Yamal LNG Plant

Yamal LNG Project, CWP3B Package: Module Installation and Connection Works for Utility and Offsite, Mechanical Works, Piping Works, EPC (Engineering-Procurement-Erection) Tanks and Buildings, Electrical and Instrumentation Works.

Installation of the Yamal LNG Plant which is the first LNG plant on the pole, in addition is one of the world’s largest industrial facilities are completed successfully despite the harsh and challenging weather conditions.

Khurais Gas & Oil Separation Plant

The Khurais project as a whole covers three oilfields: Khurais, Abu Jifan and Mazalij. Throughout this region there are numerous gas oil separation plants (GOSPs), which provide the initial separation of water and gas from the oil prior to shipment to Abqaiq for further processing.

GAMA Industry provided civil, infrastructure, structural, architectural, electromechanical erection works of gas and oil separation plant and make it ready for commissioning.

Kocaeli Integrated Health Campus Project

Ministry of Health of Republic of Turkey awarded the Contract of the Construction of Kocaeli Integrated Health Campus and Provide Goods and Services Project, tendered as part of PPP (Public-Private Partnership) projects, to Kocaeli Hospital Investment and Health Care Services Inc.

Kocaeli Hospital Investment and Health Care Services Inc. (SPV) and GAMA-Türkerler Joint Venture have signed the EPC Contract. Project is constructed over a 368,668 m² land consisting of several hospitals with a total enclosed area of 335,648 m² and a bed capacity of 1,180.

The health campus is going to include three hospital buildings which are Main Hospital, Physical Therapy and Rehabilitation Hospital and High Security Forensic Hospital and one Technical Service building.

Izmir Bayrakli Integrated Health Campus

Ministry of Health of Republic of Turkey awarded the Contract of the Construction of Izmir Bayrakli Integrated Health Campus and Provide Goods and Services Project, tendered as part of PPP (Public-Private Partnership) projects, to Izmir Bayrakli Hospital Investment and Health Care Services Inc. on September 06, 2014.

EPC Contract has been signed between Izmir Bayrakli Hastane Yatirim ve Sağlik Hizmetleri A.Ş. (SPV) and Türkerler-GAMA JV.

Project is constructed over a 573,547 m² land and the bed capacity is 2,060. The health campus is going to include three hospital buildings which are Main Hospital, Physical Therapy and Rehabilitation Hospital and High Security Forensic Hospital and one Technical Service building.

Marmaray Project, Bosphorus Railway Crossing Tunnel Construction

General Directorate of Infrastructure Investments of Republic of Turkey, Ministry of Transport, Maritime Affairs and Communications, awarded the contract for the construction of the 1st phase of Marmaray Project, Railway Bosphorus Tube Crossing, Tunnels and Stations to Taisei-GAMA-Nurol Joint Venture (TGN). GAMA has a share of 12.5% within the Joint Venture.

  • Length of Project alignment: 76.3 km
  • Underground section of the alignment: (between Ayrılıkçeşme-Yedikule) 13.6 km
  • Total number of stations on the alignment: 40 (37 above ground, 3 underground stations)
  • Number of stations suitable for transfer to other railway systems: 4
  • Transfer stations for intercity trains: 8
  • Tracks between Gebze-Ayrılıkçeşme and Kazlıçeşme-Halkalı: 3
  • Tracks between Ayrılıkçeşme-Kazlıçeşme: 2
  • Number of passengers in one direction: 75,000
  • Length of immersed tube tunnel: 1,387 m
  • Deepest point in the immersed tube tunnel alignment: 60.46 m
  • Minimum curve radius in the alignment: 300 m
  • Maximum vertical track gradient: 1.8 %
  • Design speed: 100 km/hour
  • Platform length: 225 m
  • Average distance between stations: 1.9 km
  • Headway between train operations in the alignment: 2 minutes

Kaluga Electro Steel Melting Complex

Kaluga Electro Steel Melting Complex Project is realized as a “Greenfield Project” by GAMA Industry Inc.

The complex, which has been working in normal manufacturing regime since August 2013, can handle 2 million ton of scrap iron and produce 1 million ton of reinforcing steel bars and hot rolled profiles annually.

The Project, which has quite big volume of works with main items of 2,000,000 m3 earthworks, 120,000 m3 concrete, 45,000 ton structural steel and 10,000 ton equipment erection,  consists of electric arc and ladle furnaces, 8-strand caster, billet handling and storage facilities, de-dusting plant, water treatment plants, scrap yard, material preparation plant and other auxiliary units.

2×35 MW Kashagan Natural Gas Fired Simple Cycle Power Plant

2×35 MW Natural Gas Fired Simple Cycle Power Plant is implemented on a turnkey basis.

The Power Plant provides electrical power to be used by the onshore processing facility. The equipments are mainly;  2 nos GE 6B Gas Turbines, 3 nos Essential Diesel Generators, Power Generation Building, Essential Diesel Generator Building, Step up Transformers, 35/10/0,7/0,4 kV Switchgears and DCS.

This project is undertaken and executed by GATE İnşaat Taahhüt San. ve Tes. A.Ş., a subsidiary of GAMA with %50 share.

Kashagan Main Works – Tranche 3

The project is construction of Main Pipe Rack for Tranche 3, Oil Processing Unit for Tranche 3 and Gas Compression Unit 361 of Petroleum Process Facility under Kashagan Field Development Project – Experimental Program.

Scope of project is; supply of all civil works materials, paint, insulation, support and all consumables, execution of civil works, construction of industrial buildings, fabrication and erection of steel structures, prefabrication of piping spools and installation, installation of equipment, electrical and instrumentation works, painting and insulation works.

This project is undertaken and executed by GATE İnşaat Taahhüt San. ve Tes. A.Ş. a subsidiary of GAMA with %50 share.