LAZURNAYA RESORT HOTEL (5 STAR)

Lazurnaya Resort Hotel (5 Star)

GAMA Industry performed turnkey design, supply of materials and construction of a 24-storey five-star hotel comprising 238 normal rooms, 39 deluxe rooms, 17 suits, 6 villas, restaurants, night clubs, casino, health centre, indoor and outdoor swimming pools, tennis courts, beach facilities and garage.

Villa Compound

GAMA Industry performed design, supply and construction of a compound with 30 detached villas and the related auxiliary facilities with a total closed construction area of 33,000 m2 and 35,000 m2 of outdoor area.

Mersin Villas Complex & Related Facilities

GAMA constructed detached housing (villas) complex within a 85,000 m2 area as a property development project. The project included 173 villas of 5 different types, shopping center, administrative and social facilities, swimming pool, sport fields, children play areas, infrastructure, sewage treatment plant , landscaping and beach facilities.

EPCC Cement Plant New Clinker Production Line

Construction of the 3,500 ton per day capacity New Clinker Production Line No.3, including raw material and meal preparation and storage, preheater and clinker production, clinker cooling, clinker storage, raw meal and clinker dedusting, heat recovery and transportation systems is implemented.

This project is executed by GAMA Industry Arabia Ltd.

Ibn Zahr Polypropylene II Plant

The existing Polypropylene Plant (PP I) at IBN ZAHR complex in Al-Jubail, Saudi Arabia is extended by a new plant and associated facilities (PP II) to increase the polypropylene capacity to 320 KTA.

GAMA Industry executed the turn-key erection of the PP II plant as a subcontractor to Saudi Arabian Parsons Ltd.

Hawiyah Gas Plant

The gas to be treated at Hawiyah Gas Plant arrives to the Plant through gas manifolds and trunk lines. The treated gas is then given to gas pipeline grid system.

GAMA Industry executed two contracts is the mechanical erection works package of Utility and Sulphur Recorvery units of Hawiyah Gas Plant.

The scope covers the construction of 23 buildings, plant foundations, underground RTR piping works and other related works for the first contract. Within the context of the second contract a utilities area (covering steam, instrument air, nitrogen, fire water, utility water, demin-water, etc.), a sulphur recorvery area where the hydrogen sulfide (H2S) in the gas in converted into hydrogen (H2) and molten sulphur (S4), a sulphur loading area (tanks ans loading facilities) and other areas (fire training etc.), are included.

Petrokemya Polyethylene Plant

GAMA Industry performed Engineering-Procurement-Construction of 4 industrial buildings with a total volume of 29,149 cubic meters and execution of complete civil and mechanical installation works for construction of new Polyethylene Plant having a production capacity of 800 KTA.

Berri Gas Plant Qatif Facilities

GAMA Industry performed construction of new production facilities and revamping of existing facilities including civil and mechanical works.