HADEED II DIRECT REDUCTION PLANT

Hadeed II Direct Reduction Plant

GAMA Industry performed mechanical erection, partial material supply and instrumentation of 1,240,000 tpy capacity Direct Reduction Plant based on 93% metallisation of DRI.

Epoxy Resin Plant

GAMA Industry performed turnkey construction of 19,700 tons per year capacity Epoxy Resin Plant including the port facilities and product pipeline.

Turkmenbashi Refinery – Lube Oil Plant

Within the modernisation of the existing Türkmenbashy Refinery, a new 76,200 ton/year capacity lube oil unit is included. GAMA Industry and Philipp Holzmann of Germany formed a consortium to execute the turnkey construction of the plant as a subcontractor to main contractor Technip – Germany.

Turkmenbashi Refinery MSCC Plant

750,000 ton/year Continuous Catalytic Platformer Unit is the first of a series of projects, within the Modernisation Program of the existing 50 years old Turkmenbashi Refinery, located in western Turkmenistan, on the Caspian Sea shores.

GAMA Industry executed the turnkey construction of this refinery unit as a consortium member, together with Chioda Co. from Japan.

Molnia Mother and Child Health Care Center

GAMA Industry executed turnkey design, supply and construction of fully furnished facility in four star hotel quality standards.

The center includes 240 guest rooms with individual bathrooms, 24 deluxe rooms, 12 suite rooms with individual bathrooms, 2 restaurants, roof and lobby bar, night club and disco, indoor and outdoor swimming pools, pool bar, outdoor sports fields (tennis, volleyball, basketball, football, badminton), heating and technical centers, two saunas and fitness center.

Petro Rabigh Polyethylene Plant, PC1 – PE Plants

GAMA performed civil construction, structural steel erection, equipment installation, pipe prefabrication and erection, painting and insulation works for the two reactor buildings, process buildings, extrusion building, powder & pellet silo structures & silos, infrastructure, transformer stations and the other auxiliary buildings of the two polyethylene plants which are EPPE (Easy Process Polyethylene) and LLDPE (Linear Low Density Polyethylene) having production capacity of 250,000 Ton and 350,000 Ton per year respectively.

This project is undertaken by GAMA Industry Arabia Ltd.

Tasnee Polyethylene Plant

Construction, structural steel, equipment and piping installation works for the LDPE/HDPE Plant in Jubail city of Saudi Arabia is subcontracted to GAMA Industry Arabia Ltd. by the main contractor Tecnimont Arabia Ltd.