GAMA performed construction of a new clinker production line with a capacity of 7,000 tons/day starting from and including the new limestone crusher up to and including the packing and bulk loading plant as well as construction work for new power plant and connection to existing lines.
Grouping: GAMA Industry
GAMA performed camp infrastructure works.
GAMA is responsible for the civil construction, structural steel fabrication and erection, reinforced concrete and structural steel buildings (design + material + labour), equipment erection, pipe erection, painting and insulation works, electrical and instrumentation works and pre-commissioning works of the NHT Revamp, Reformer, Catalyst Regeneration, Benfree, Flare, Condensate Recovery, Process & Utility, Yard Line and Tankage Area, Hydrojen Presurrising & Storage units and Control, Substation and Analyzer buildings.
Mechanical erection of 3×600 MW boilers, 3 pcs. electrostatic filter, 1 pcs. ash handling system and 1 pcs. auxiliary boiler including paint touch-up works are implemented.
Execution of all civil works, steel structure, mechanical, electrical erection, piping, instrumentation, painting and insulation works of 238 MW natural gas fired combined cycle power plant composed of 4×42 MW gas turbines and 2×35 MW steam turbines for the power supply for Trench 1 and 2 of Kashagan Petroleum Area.
This project is undertaken and executed by GATE İnşaat Taahhüt San. ve Tes. A.Ş., a subsidiary of GAMA with %50 share.
GAMA executed civil, electrical & instrumentation, mechanical, painting and insulation works for slug catcher, inlet, waste water treatment, effluent, flare, utilities, cooling water/sea water, cooling water pump, sulphur storage tanks’ and chemical tanks’ areas for trains 6 and 7.
GAMA performed all civil and mechanical installation works, commissioning & start-up assistance including operation and maintenance of temporary camp and office facilities for the Shell Pearl GTL Air Separation Unit (ASU) at Ras Laffan Industrial City in the State of Qatar.
Pearl GTL Plant is world’s largest gas-to-liquids plant.
The project, consists of 4 main sections; 3 sulphuric acid production plants, each with the capacity of 5,000 tons/day, and a common part serving to these 3 plants, is undertaken by GAMA Industry Arabia Ltd.
As a consortium partner of main contractor Alstom in 2×338 MW power plant, execution of all civil works and mechanical works in BOP.
Tekfen – GAMA (TGO) executed all civil works of the power plant, and BOP mechanical works (all mechanical works excluded from units), piping, HVAC and FF works.