KIZILAY COMMON UNDERGROUND STATION

Kizilay Common Underground Station

Turnkey construction of Kizilay Common Underground Station is undertaken by GAMA – Güriş Joint Venture.

Design and construction works of three level underground station building with 36,000 m2 of building area aree implemented by using top-down construction method.

GAMA – GÜRİŞ Business and Shopping Center

Construction of a business and shopping centre with a total built-up construction area of 22,000 m2 is executed.

The building is composed of two blocks with 7 and 11 storeys.

GAMA is responsible for the design, supply and construction of civil and architectural works.

Ertugrul Gazi Mosque and Cultural Center

Detail design, and turn-key supply and construction of a complex of facilities consisting of the mosque, the Turkish Cultural Center and landscaping of 17 ha.

  • Total construction area of the mosque: 3,767 m2
  • Total construction area of the cultural center: 3,500 m2

Caustic Soda Prilling Plant

GAMA Industry performed turnkey construction of 50,000 tpa Caustic Soda Prilling Plant, including civil construction and electro-mechanical erection as well as structural steel fabrication, material supply for all civil construction works and for some electrical/instrumentation works.

Sakufa Cement Plant

GAMA Industry executed complete mechanical and electrical erection of a new  7,000 tons/day capacity cement plant, including raw materials handling plant, raw mill, kiln and preheater plants, cement grinding plant, clinker and cement storage plants, packing unit, high and low voltage electrical systems and auxiliary units.

150 MW Kirikkale Diesel Power Plant

Based on PPA, the project is a fully privately financed and constructed on turn-key basis with two significant phases:

  1. Construction of 150 MW (established capacity) combined cycle diesel power plant (consist of 13 each 11 MW engines and one 9.5 MW steam turbune & generator),
  2. Operation of the power plant for 5 years with 8,760 hr/year and 130 MW-100% availability.

EPC contract includes all basic & detailed design of the power plant, procurement of all power plant equipment, all civil, structural works, all mechanical erection works, installation of all electrical, instrumentation and control systems. The contract also includes commissioning, start-up works and training of client’s personnel.

Operation of the plant is also in the scope of GAMA.

2×660 MW Iskenderun Sugozu Coal Fired Power Plant

The project consists of turn-key construction of two units of imported coal fired steam boilers and turbine generator sets with a total capacity of 1320 MW electric power (2×660 MW) including coal handling system, flue gas desulphurization plant, sea water cooling handling system, coal unloading jetty, stack and other auxiliary units.

GAMA – Tekfen Joint Venture was responsible for the construction of the plant, including the coal unloading jetty.