Complete civil works, manufacturing and installation of GT building and pipe racks steel structure, complete mechanical, electrical and instrumentation installation, provision and operation of camp and office facilities for Alstom staff.
Grouping: GAMA Industry
GAMA Industry performed turnkey construction of Yamama Cement Production Line No.7 with 10,000 tonnes/day clinker capacity at the existing cement plant facilities, within the scope of “Sales & Purchase Contract” and “Construction & Erection Contract”, including the construction of a new cement mill unit for the existing Line No.6 .
At the time, world’s biggest cement plant; Yamama Cement Plant is executed by GAMA Industry Arabia Ltd.
Mechanical, electrical and instrumentation erection works of a new 4,000 ton per day capacity clinker production line.
GAMA Industry performed construction and erection works to increase the production capacity from 1,800 tons/day to 4,500 tons/day by precalcination.
Design, construction, manufacturing and complete mechanical and electrical erection of kiln precalcination unit.
GAMA Industry executed construction, manufacturing and erection of Precalcination Unit.
GAMA Industry executed Line No. 2 Plant Expansion Project consisting of 6,000 tons/day portland cement production line and associated systems.
GAMA Industry performed construction and erection of 1,500 ton/day capacity clinker production line as an extension to the existing factory, including crushing plant, raw materials grinding plant, preheater, kiln, dedusting unit and other associated systems including power supply system.
Turnkey construction of 14.6 km heavy rail transit system, 7 km being underground with 12 passenger stations including an operation and maintenance center with parking facility.
GAMA – Guris Joint Venture (50%-50%) executed the detailed design, procurement, construction, test and commissioning of complete civil and building works – incluidng tunneling, building services and tunnel ventilation and installation of all electrical and mechanical subsystems.
The system is equipped with 108 vehicles operating in six-car trains of triplets with 90 second headway moving block automatic train control (ATC) system.