The project mainly consists of the construction of an earthfill dam, installation of a total of 133,290 linear meters of steel and ductile iron water transmission pipe-lines and construction of two booster pumping stations in Built-Operate-Transfer basis.
Grouping: GAMA Industry
Erection of mechanical, equipment and installation of electrical/ instrumentation systems for the modernisation/capacity increase of AKSA Acrylic Plant, consisting of the following sections: Charge preparation unit, Polymerisation unit, Solvent unit, D.O.P unit, Autoclave unit, Packaging unit.
GAMA Industry performed turnkey construction of the surface facilities for the copper/zinc beneficiation plant including partial basic and detail engineering and local equipment/material supply.
Design, supply and construction of a unique coal conveyor system, extending from Denis coal mines to Soma Power Plant was performed by GAMA in two phases. A 8,500 m long, single line, down hill belt conveyor system are constructed during the first phase whereas two 5,500 m long lines were installed during the second phase.
The conveyors have a capacity of 1,000 tons/hr each, a belt width of 1,000 mm and belt speed of 4.5 m/sec.
The Project was executed in technological partnership with KRUPP Industritechnik GmbH (Germany), a subcontractor to GAMA Industry.
Turnkey construction of a Waste Water Treatment Plant including sewage decomposing unit, 220 hectares of waste stabilisation and emergency ponds, 40 km long 50” diameter pipeline including cathodic protection, 4 km long access roads, waste collection and pretreatment system, odour control system, 110 kg/hr automatic chlorination system and maintenance facilities.
Turnkey construction and erection of the 25,000 t/yr Sodium Bichromate and 8,500 t/yr Sodium Sulfide Complex.
The scope of GAMA includes civil construction, steel structure, stack, piping, mechanical and electrical installations of all equipment such as kilns, furnaces, electroprecipitators, pre-heaters, tanks, vessels, pumps and compressors, transformers and switch gears.
Erection of 37 km. long, 4″-44″ diameter pipeline for Izmir Aliaga Refinery.
Turnkey construction of the 670 ton/hr Iron Ore Concentration Plant including the thickener systems, turbo screens, magnetic separators, feeders and conveying system, pumps, compressors.
Civil, structural steel supply and erection, electrical and HVAC works of MAN Bus and Truck Assembly Plant Extension Facilities in Ankara.
Material supply and construction of 11,515 m2 closed building area and 14,915 m2 open area; complete mechanical erection of buildings including sanitary, plumping & HVAC systems and complete electrical installation of lighting and power systems are implemented.