ISTANBUL METRO (SUBWAY) SYSTEM, PHASE I

Ipek Paper Mill

Turn-key civil construction of a Paper Mill consisting of reel storage unit, workshop, boiler plant extension, infrastructural works, roads and storage areas is implemented.

Mercedes-Benz Bus Assembly Plant

Turnkey civil construction of 35,000 m2 plant building for Mercedes-Benz bus assembly including auxiliary facilities is implemented.

Qatar Embassy and Ambassador Residence

GAMA Industry performed turnkey supply and construction of embassy, ambassador redidence, visa section and guard houses, landscaping and infrastructural works.

Construction area: 6,452 m2 closed building area + 9,263 m2 outdoor area

BRISA – Bridgestone Tire Factory

Construction of 100,000 m2 of factory building with space frame steel construction roof, surface hardened reinforced concrete floor, roof covering and wall cladding by painted steel and polyurethane sandwich panels are executed.

White House (Russian Parliament) Building Repair Works

Supply, repair and renovation of architectural and finishing works of Russian Parliament Building (White House) which had been heavily damaged and burned as a result of artillery shelling and gunfire in October 1993.

GAMA was awarded a “Certificate of Honor” by the Russian Government for completing the renovation of the Russian Parliament Building on time and to the highest standards.

Technical Office Building

Construction of Technical Office Building with a total built-up construction area of 12,000 mis performed on turnkey basis; design, supply and civil construction of the building.

Gazprom Headquarters Complex

GAMA Industry performed turnkey design, supply and construction of Business Complex comprising 36 storey high main office building, communication center, bank, conference hall, restaurant building, sports and clinic building, storage building, four star, 80 room hotel block and an underground garage for 300 cars.

Gazprom Headquarters Complex was the tallest building in Russia, at the time.