390 MW KAZANSKAYA COMBINED CYCLE POWER PLANT

390 MW Kazanskaya Combined Cycle Power Plant

EPC Contract for Modernization of 390 MW Kazanskaya CHPP-3 is implemented on a turnkey basis.

Modernization of Kazan CHPP-3 envisages delivery and installation of 1 piece of GE 9HA 01 gas turbine, 1 piece of GE H28.56 generator, 1 piece of CMI double-pressure HRSG.

EPC Contract’s scope covers procurement of all major equipment as well as other auxiliary equipment, and conceptual and detail engineering of the plant, civil and electro-mechanical installation works, test and commissioning works and training of the Employer’s staff.

200 MW Hartha Thermal Power Station Rehabilitation – Unit 4

Hartha Unit-4 Rehabilitation project consists of rehabilitation of instruments and control system of turbine and boiler, rehabilitation of generator and electrical equipments, rehabilitation of boiler runs on 4 types of fuel, rehabilitation of turbine and  increase the output of generator to its original value 200 MW and extend the lifetime of the boiler, turbine and generator to 10 years.

GAMA Power Systems performed all mechanical erection works & rehabilitation works and installation & rehabilitation of all electrical, instrumentation and control systems.

200 MW Hartha Thermal Power Station Rehabilitation – Unit 1

EPC Contract for 200 MW Hartha Thermal Power Station Rehabilitation – Unit 1 Project is undertaken on a turnkey basis.

GAMA Power Systems and Mitsubishi Hitachi Power Systems (MHPS) signed the contract with the Ministry of Electricity Republic of Iraq, General Directorate of Electricity & Energy Production Basrah for Rehabilitation of Hartha Unit-1 Thermal Power Station on 21.12.2017.

Hartha Thermal Power Plant Project has become an essential source of power for the Basra region, which constantly has unwanted power outages.

THE GIL PROFILE PARK GENERATION FACILITY

GAMA Construction Ireland Limited (GCIL) was awarded as being the EPC Contractor for construction of the GIL Profile Park Generation Facility on EPC basis whose scope of works covers the design & equipment / material supply within the BOP boundaries including Grid Connection work and services of overall project scope in compliant with local regulations, international Codes & Standards, and EirGrid Specifications.

Isdemir – 6 & 7 Steam Boiler Project

Engineering, procurement, fabrication and installation of two steam boilers with a capacity of 250 ton/hr at the İskenderun Iron and Steel Works Company.

2×8 MW Cumra Sugar Factory Power Plant

GAMA Power Systems implemented turnkey design, supply and construction of a coal fired power plant, comprising 2 sets Babcock & Wilcox licensed 75 ton/hr (38 bar (a), 425°C) steam supply. Circulated Fluidized Bed (CFB) boiler, 2 sets Siemens steam turbine generators and one ea. 38 bar (a), 425°C steam supply, 60 ton/hr. capacity package type boiler, coal and limestone storage buildings including all auxiliary components.

38 MW Ayen Combined Cycle Power Plant

GAMA Power Systems performed turnkey design, supply and construction of a natural gas fired combined cycle power plant, comprising GE (USA) LM2500 PY+DLE double shaft aeroderative gas turbine, Thermodyn (France) steam turbine and Aalborg Engineering (Denmark) HRSG (generating 30 tons/hr of high pressure and 7 tons/hr of low pressure steam), including all auxiliary components.