300 MW SAMRA COMBINED CYCLE POWER PLANT

300 MW Samra Combined Cycle Power Plant

Project is a natural gas/fuel oil fired combine cycle plant providing a nominal 300 MW electrical output. The power island consists of two GE combustion turbine generators, which feed exhaust gases to two Nooter Eriksen HRSGs, which in turn feed steam to a single Fuji steam turbine generator set. The plant fires natural gas fuel and fuel oil. Power is generated at 15 kV in the CTGs and 15 kV in the STG, and then stepped up through individual transformers to the Jordan grid voltage at 400 kV. Plant auxiliary power is back-fed from the grid or GSUs through an auxiliary transformer on each CTG bus.

EPC Contract’s scope covers procurement of all major equipment as well as other auxiliary equipment, and conceptual and detail engineering of the plant, civil and electro-mechanical installation works, test and commissioning works and training of the Employer’s staff.

450 MW Whitegate Combined Cycle Power Plant

EPC Contract for 450 MW Whitegate Combined Cycle Power Plant is implemented on a turnkey basis

GE Corporation – GE International Inc. – GAMA Power Systems Consortium’s scope of supply for this project is to construct one 109FB 50Hz Single-Shaft configured power plant, comprised of one GE 9FB gas turbine, one GE A15 steam turbine, one GE 450H generator, heat recovery steam generator, plus balance of plant equipment necessary for the plant’s operation.

EPC Contract’s scope covers procurement of all major equipment as well as other auxiliary equipment, and conceptual and detail engineering of the plant, civil and electro-mechanical installation works, test and commissioning works and training of the Employer’s staff.

400 MW Tynagh Combined Cycle Power Plant

Tynagh Energy Limited has built Galway’s first power generation facility. The circa €300 million power plant is a modern state-of-the art facility using the latest in advanced engineering technology. It uses the cleanest available fuel, natural gas, which significantly reduces emissions of carbon dioxide. For the first time, Galway city and the region has a reliable and efficient source of power.

Approximately 30 years life-span power plant was built under a turnkey contract with a consortium of General Electric Company / General Electric International Inc. and GAMA Power Systems Inc. The gas turbine used is a GE 9FA design. F-class gas turbines were developed in the late 1980s and are considered commercially proven with a track record of high availability and reliability. The steam turbine is a GE A15 ‘HEAT’ (high efficiency advanced technology) model, with a GE 9A5 electrical generator. The designs of both the A15 steam turbine and the 9A5 electrical generator were developments from previous GE models that are fully proven technology. These are logical evolutions from previous models and incorporate GE’s comprehensive design process and field-testing facilities which are without doubt world-class.

TUPRAS 10F/105A Steam Boiler Retubing Works

Re-tubing and repair of pressure and non pressure parts of 10F-105A Steam Boiler in Tupras Refinery in Izmit. This boiler was originally built in 1997 by GAMA and had suffered an extensive damage due to an accident on February 2006.

Entek Izmit Cogeneration Plant HRSG

Turnkey EPC project for installation of two pressure HRSG behind GE LM6000 PC Sprint type Gas Turbine and by-pass stack at İzmit Electric Power Generation Plant.

Pressure and output of HRSG; HP: 55 bara/14,5 ton/hr.