2 pcs. package type boiler ve BOP systems supply and Ankara delivery, 2 supervisor and 2 welder 2 months site works.
Grouping: GAMA Power
Supply and installation of Enerjisa Adana Combined Cycle Power Plant auxiliary steam boilers and turn key basis supply belongs to these systems.
Towerpack type Stirling, coal fired, boiler design, supply and construction.
1 ea. fuel oil fired FM20-70 Babcock&Wilcox; steam boiler design, supply and construction.
Four ea. FM 120/97 type, natural gas and oil fired, boiler design, supply and construction.
Two sets of HRSG (behind Frame 6 gas turbine) design, supply and construction
Two sets of FM 120/97 (88 t/hr) natural gas and oil fired, boiler design, supply and construction.
Construction of a Combined Cycle Power Plant (CCPP) in Kırıkkale, Turkey with a total power output of 853 MW is realized for İç Anadolu Doğalgaz Elektrik Üretim ve Ticaret A.Ş. is implemented on a turnkey basis.
GE STAG 209 9FB MS, is used in the power plant which is designed for 30 years lifespan. GAMA Power Systems and GE Energy as consortium undertakes the responsibility of supply and erection of 2 GE 9FB gas turbines, 1 GE steam turbines, 2 Doosan HRSG’s, Air Cooled Condenser, 380 kV HV switchyard as well as all balance of plant equipment under an EPC contract. Within this scope, basic & detail design of the power plant, civil works, structural, electro mechanical works, erection, installation of electrical, instrumentation & control systems, test and commissioning, start-up works and training of the Employer’s personnel performed in the course of project.
İç Anadolu Combined Cycle Power Plant generates about 6,300 GWh Energy which corresponds 2.5% of total national Energy consumption and almost 50% of Ankara’s energy consumption.
EPC Contract for 1800 MW ALBA Line 6 Expansion, Power Station 5 Project is undertaken on a turnkey basis.
The Project scope consists of engineering, procurement and construction of three GE 9 HA.01 Gas Turbines and three GE A650 Steam Turbines with 1x1x1 multishaft configuration. GAMA Power Systems is responsible for engineering and procurement of all BOP systems and overall construction works. Commissioning scope is limited with Consortium members’ own scope of supply systems only.
With the investment of the largest and most efficient power plant in Bahrain; 1800 MW Combined Cycle Power Plant project, Employer Aluminium Bahrain B.S.C. (ALBA), targets to provide energy for the new “Smelter Expansion” project as well as development of the current power supply units with the new technology gas turbines providing higher efficiency. The energy to be provided to the new “Smelter Expansion” project will lead ALBA to be the largest aluminium smelter in the world.