3×400 MW SHOAIBA THERMAL POWER PLANT (STAGE-3)

3×400 MW Shoaiba Thermal Power Plant (Stage-3)

GAMA performed mechanical erection of 3×400 MW boilers, 3 pcs. electrostatic filter, 3 pcs. ash handling system and tagging works.

Location Icon
Location
Shoaiba, Saudi Arabia
Client Icon
Client
SEC (Saudi Electricity Company)
Duration Icon
Project Duration
24 Months (June 2009 – June 2011)