2×39.5 MW Erdemir Cogeneration Power Plant, Turkey

2×39.5 MW Erdemir Cogeneration Power Plant

Turnkey design, supply and construction of a natural gas fired cogeneration plant, comprising two GE frame 6B gas turbine generators (39.5 MW capacity each) and two HRSG’s (each generating 80 tons/hr of medium pressure and 4 tons/hr of low pressure steam), including all auxiliary components are executed.

Location Icon
Location

Eregli, Turkey

Client Icon
Client

Eregli Demir ve Celik Fabrikalari A.S. (Erdemir) / Turkey

Contractor Icon
Contractor

Consortium of ELIN Energieversorgung (Austria), Babcock and Wilcox, GAMA (BWG) (Turkey)

Duration Icon
Project Duration

First Unit: 14 Months (April 1996 - June 1997) • Second Unit: 16 Months (April 1996 - August 1997)