3×400 MW Shoaiba Thermal Power Plant (Stage-3)
GAMA performed mechanical erection of 3×400 MW boilers, 3 pcs. electrostatic filter, 3 pcs. ash handling system and tagging works.
GAMA performed mechanical erection of 3×400 MW boilers, 3 pcs. electrostatic filter, 3 pcs. ash handling system and tagging works.