6×380 MW Shoaiba Thermal Power Plant (Stage II – Phase 1+2), Saudi Arabia

6×380 MW Shoaiba Thermal Power Plant (Stage II – Phase 1+2)

GAMA performed Mechanical Erection Works for the 6 fuel oil fired Boilers, Electrostatic Precipitators and Ash Disposal System of the (3+3) x 380 MW Shoaiba Power Plant Units 6 to 11.

Total Erection Weight is 49,572 tons for 6 Units.

Location Icon
Location

Shoaiba Jeddah, Saudi Arabia

Client Icon
Client

Sceco West of S. Arabia

Contractor Icon
Contractor

Alstom Power Inc. (API) - USA

Duration Icon
Project Duration

36 Months (August 2004 - August 2007)