200 MW HARTHA THERMAL POWER STATION REHABILITATION – UNIT 4

200 MW Hartha Thermal Power Station Rehabilitation – Unit 4

Hartha Unit-4 Rehabilitation project consists of rehabilitation of instruments and control system of turbine and boiler, rehabilitation of generator and electrical equipments, rehabilitation of boiler runs on 4 types of fuel, rehabilitation of turbine and  increase the output of generator to its original value 200 MW and extend the lifetime of the boiler, turbine and generator to 10 years.

GAMA Power Systems performed all mechanical erection works & rehabilitation works and installation & rehabilitation of all electrical, instrumentation and control systems.

Location Icon
Location
Hartha, Iraq
Client Icon
Client
Ministry of Electricity (MOE) of Iraq
Contractor Icon
Contractor
GAMA Power Systems and Mitsubishi Hitachi Power Systems (MHPS)
Duration Icon
Project Duration
20 Months (April 2016 - December 2017)