2×150 MW Khabat Combined Cycle Power Plant, Unit 1&2, Iraq

2×150 MW Khabat Combined Cycle Power Plant, Unit 1&2

POSCO E&C signed an EPC Contract with Ministry of Electricity of Northern Iraq Regional Government for a 2×150 MW thermal power plant with 2 Fuel Oil/Diesel Fuel Oil Boiler and 2 Steam Turbine & Generator sets. GAMA Power Systems signed a sub-contractor agreement with POSCO E&C. Design and Procurement of Boiler, Steam Turbine, Condenser, FGD and Feed water pump is in the POSCO E&C’s Scope. POSCO designed Main Steam and design and procurement of Boiler, Steam Turbine, Condenser, FGD, Distributed Control System (DCS) and Boiler Feed Water pumps has been commenced by POSCO E&C.
Except above mentioned systems, design and procurement of project mechanical and electrical BOP Systems, all buildings and underground works are executed by GAMA Power Systems. Additionally, GAMA Power Systems executed the construction and erection works at site.
With its completion the plant generates energy around 1,600 GWh per year which have a significant contribution to energy production in Iraq and improve energy security in the country.

Location Icon
Location

Erbil, Iraq

Client Icon
Client

Ministry of Electricity of Northern Iraq

Contractor Icon
Contractor

POSCO E&C (Sub-contractor: GAMA Power Systems Inc.)

Duration Icon
Project Duration

79 Months (September 2013 - February 2020)