2×8 MW Cumra Sugar Factory Power Plant, Turkey

2×8 MW Cumra Sugar Factory Power Plant

GAMA Power Systems implemented turnkey design, supply and construction of a coal fired power plant, comprising 2 sets Babcock & Wilcox licensed 75 ton/hr (38 bar (a), 425°C) steam supply. Circulated Fluidized Bed (CFB) boiler, 2 sets Siemens steam turbine generators and one ea. 38 bar (a), 425°C steam supply, 60 ton/hr. capacity package type boiler, coal and limestone storage buildings including all auxiliary components.

Location Icon
Location

Konya, Turkey

Client Icon
Client

Konya Sugar Factory Inc. / TURKEY

Contractor Icon
Contractor

GAMA Power Systems Inc.

Duration Icon
Project Duration

16 Months (July 2003 - December 2004)