HILLA SEWAGE PROJECT (PHASE 1)

HILLA SEWAGE PROJECT (PHASE 1)

The project involves the construction of rainwater and wastewater networks, incorporating 10 main stations and 5 secondary lifting stations.
The Joint Venture is responsible for constructing 359 km of GRP and PVC pipe sewage and rainwater networks, along with civil, structural, and electromechanical works, including the erection of Pumping Stations and commissioning equipment and facilities, under a unit price basis contract.

200 MW Hartha Thermal Power Station Rehabilitation – Unit 1

EPC Contract for 200 MW Hartha Thermal Power Station Rehabilitation – Unit 1 Project is undertaken on a turnkey basis.

GAMA Power Systems and Mitsubishi Hitachi Power Systems (MHPS) signed the contract with the Ministry of Electricity Republic of Iraq, General Directorate of Electricity & Energy Production Basrah for Rehabilitation of Hartha Unit-1 Thermal Power Station on 21.12.2017.

Hartha Thermal Power Plant Project has become an essential source of power for the Basra region, which constantly has unwanted power outages.

2×150 MW Khabat Combined Cycle Power Plant, Unit 1&2

POSCO E&C signed an EPC Contract with Ministry of Electricity of Northern Iraq Regional Government for a 2×150 MW thermal power plant with 2 Fuel Oil/Diesel Fuel Oil Boiler and 2 Steam Turbine & Generator sets. GAMA Power Systems signed a sub-contractor agreement with POSCO E&C. Design and Procurement of Boiler, Steam Turbine, Condenser, FGD and Feed water pump is in the POSCO E&C’s Scope. POSCO designed Main Steam and design and procurement of Boiler, Steam Turbine, Condenser, FGD, Distributed Control System (DCS) and Boiler Feed Water pumps has been commenced by POSCO E&C.
Except above mentioned systems, design and procurement of project mechanical and electrical BOP Systems, all buildings and underground works are executed by GAMA Power Systems. Additionally, GAMA Power Systems executed the construction and erection works at site.
With its completion the plant generates energy around 1,600 GWh per year which have a significant contribution to energy production in Iraq and improve energy security in the country.

200 MW Hartha Thermal Power Station Rehabilitation – Unit 4

Hartha Unit-4 Rehabilitation project consists of rehabilitation of instruments and control system of turbine and boiler, rehabilitation of generator and electrical equipments, rehabilitation of boiler runs on 4 types of fuel, rehabilitation of turbine and  increase the output of generator to its original value 200 MW and extend the lifetime of the boiler, turbine and generator to 10 years.

GAMA Power Systems performed all mechanical erection works & rehabilitation works and installation & rehabilitation of all electrical, instrumentation and control systems.

Baiji Lube Oil Refinery

GAMA Industry performed complete mechanical equipment and piping erection of the 250,000 tons/year capacity Lube-Oil Plant in Baiji, Iraq.

Salahuddin Refinery and its Extension

GAMA Industry performed complete erection of Salahuddin refinery and the units for extension of its capacity to 6,000,000 ton/year, including; cracking and distillation systems tanks, vessels, and internals heat exchangers, air coolers, ejectors, filters furnaces pumps, compressors steam and power generation and supply systems cracking and distillation systems.