GAMA Industry executed turnkey design, supply and construction of a fully furnished 10 storey four-star hotel consisting of 217 guest rooms, 18 suits, 1 presidential suite, conference room, 2 restaurants, night club, piano bar, café, fitness center, sauna, Turkish bath and indoor pool.
Country: Russian Federation
EPC Contract for Modernization of 390 MW Kazanskaya CHPP-3 is implemented on a turnkey basis.
Modernization of Kazan CHPP-3 envisages delivery and installation of 1 piece of GE 9HA 01 gas turbine, 1 piece of GE H28.56 generator, 1 piece of CMI double-pressure HRSG.
EPC Contract’s scope covers procurement of all major equipment as well as other auxiliary equipment, and conceptual and detail engineering of the plant, civil and electro-mechanical installation works, test and commissioning works and training of the Employer’s staff.
Hotel Complex construction, Cafe-canteen contruction and Cultural Center renovation:
- Hotel Complex: At European standarts with 5 star-level, total of 87 unit standart guest room, 5 unit delux and 1 unit king suit. The project consists of all design works (decoration included), construction, procurement and commissining items.
- Cafe-Canteen Building: Approximately 700 m2 serving to 180 people. Whole superstructure is made of woolen logs procured from Finland.
- Cultural Center Building: Renewal of roof and its drainage system, exterior door and window works and renewal of exterior building painting with some artistic works repair.
Kaluga Electro Steel Melting Complex Project is realized as a “Greenfield Project” by GAMA Industry Inc.
The complex, which has been working in normal manufacturing regime since August 2013, can handle 2 million ton of scrap iron and produce 1 million ton of reinforcing steel bars and hot rolled profiles annually.
The Project, which has quite big volume of works with main items of 2,000,000 m3 earthworks, 120,000 m3 concrete, 45,000 ton structural steel and 10,000 ton equipment erection, consists of electric arc and ladle furnaces, 8-strand caster, billet handling and storage facilities, de-dusting plant, water treatment plants, scrap yard, material preparation plant and other auxiliary units.
EPC Contract for Surgut 800 MW Combined Cycle Power Plant is implemented on a turnkey basis.
GE International Inc.(GEII) – GAMA Power Systems Consortium constructed two 109FA 50Hz Single-Shaft configured Power Plant, comprised of one GE 9FA gas turbine, one GE D10 steam turbine, one GE 390H generator, a horizontal three-pressure level CMI Heat Recovery Steam Generator, plus balance of plant equipment necessary for the plant’s operation.
EPC Contract’s scope covers procurement of all major equipment as well as other auxiliary equipment, and conceptual and detail engineering of the plant, civil and electro-mechanical installation works, test and commissioning works and training of the Employer’s staff.
EPC Contract for 400 MW Shatura Combined Cycle Power Plant is implemented on a turnkey basis.
EPC Contract’s scope covers procurement of all major equipment as well as other auxiliary equipment, and conceptual and detail engineering of the plant, civil and electro-mechanical installation works, test and commissioning works and training of the Employer’s staff.
GAMA Industry executed turnkey design, supply and construction of fully furnished facility in four star hotel quality standards.
The center includes 240 guest rooms with individual bathrooms, 24 deluxe rooms, 12 suite rooms with individual bathrooms, 2 restaurants, roof and lobby bar, night club and disco, indoor and outdoor swimming pools, pool bar, outdoor sports fields (tennis, volleyball, basketball, football, badminton), heating and technical centers, two saunas and fitness center.
GAMA Industry performed design, supply and construction of a compound with 30 detached villas and the related auxiliary facilities with a total closed construction area of 33,000 m2 and 35,000 m2 of outdoor area.
GAMA Industry performed turnkey design, supply of materials and construction of a 24-storey five-star hotel comprising 238 normal rooms, 39 deluxe rooms, 17 suits, 6 villas, restaurants, night clubs, casino, health centre, indoor and outdoor swimming pools, tennis courts, beach facilities and garage.