GAZPROM HEADQUARTERS COMPLEX

Gazprom Headquarters Complex

GAMA Industry performed turnkey design, supply and construction of Business Complex comprising 36 storey high main office building, communication center, bank, conference hall, restaurant building, sports and clinic building, storage building, four star, 80 room hotel block and an underground garage for 300 cars.

Gazprom Headquarters Complex was the tallest building in Russia, at the time.

Technical Office Building

Construction of Technical Office Building with a total built-up construction area of 12,000 mis performed on turnkey basis; design, supply and civil construction of the building.

White House (Russian Parliament) Building Repair Works

Supply, repair and renovation of architectural and finishing works of Russian Parliament Building (White House) which had been heavily damaged and burned as a result of artillery shelling and gunfire in October 1993.

GAMA was awarded a “Certificate of Honor” by the Russian Government for completing the renovation of the Russian Parliament Building on time and to the highest standards.

Tomskneft Luginetsky Gas Compressor Station

Luginetsky Gas Compressor Sation is located in a remote area, about 500 km north of Tomsk city in Western Siberia. Ambient temprature varies from +36 C during summer to -55 C in winter time. The station is planned to seperate, compress and dehydrate the associated gas from the Luginetsky oil field.

The maximum anticipated output gas capacity is about 4.3 Mm3 /day. There are two 14 MW gas turbine driven centrifugal compressors in the main station. A booster compressor station, which is, located 1.6 km away feeds the gas to the main station by two screw compressors driven by electric motors.

Yamal LNG Plant

Yamal LNG Project, CWP3B Package: Module Installation and Connection Works for Utility and Offsite, Mechanical Works, Piping Works, EPC (Engineering-Procurement-Erection) Tanks and Buildings, Electrical and Instrumentation Works.

Installation of the Yamal LNG Plant which is the first LNG plant on the pole, in addition is one of the world’s largest industrial facilities are completed successfully despite the harsh and challenging weather conditions.