Kocaeli Integrated Health Campus Project

Ministry of Health of Republic of Turkey awarded the Contract of the Construction of Kocaeli Integrated Health Campus and Provide Goods and Services Project, tendered as part of PPP (Public-Private Partnership) projects, to Kocaeli Hospital Investment and Health Care Services Inc.

Kocaeli Hospital Investment and Health Care Services Inc. (SPV) and GAMA-Türkerler Joint Venture have signed the EPC Contract. Project is constructed over a 368,668 m² land consisting of several hospitals with a total enclosed area of 335,648 m² and a bed capacity of 1,180.

The health campus is going to include three hospital buildings which are Main Hospital, Physical Therapy and Rehabilitation Hospital and High Security Forensic Hospital and one Technical Service building.

Izmir Bayrakli Integrated Health Campus

Ministry of Health of Republic of Turkey awarded the Contract of the Construction of Izmir Bayrakli Integrated Health Campus and Provide Goods and Services Project, tendered as part of PPP (Public-Private Partnership) projects, to Izmir Bayrakli Hospital Investment and Health Care Services Inc. on September 06, 2014.

EPC Contract has been signed between Izmir Bayrakli Hastane Yatirim ve Sağlik Hizmetleri A.Ş. (SPV) and Türkerler-GAMA JV.

Project is constructed over a 573,547 m² land and the bed capacity is 2,060. The health campus is going to include three hospital buildings which are Main Hospital, Physical Therapy and Rehabilitation Hospital and High Security Forensic Hospital and one Technical Service building.

1,200 MW Hamitabat Combined Cycle Power Plant

EPC Contract for Hamitabat 1200 MW Natural Gas Combined Cycle Power Plant is implemented on a turnkey basis.

The Plant is comprised in two units. Each unit is based on a single-shaft configuration, comprising of one gas turbine, one steam turbine, one generator (SGT5-8000H Gas Turbine, SST5-5000 Steam Turbine, SGen5-3000W Generator) and one Heat Recovery Steam Generator. The units are utilizing the existing dry cooling towers as a part of cooling system. Electricity is transferred to the grid via the existing substation which was refurbished.

EPC Contract’s scope covers procurement of all major equipment as well as other auxiliary equipment and conceptual and detail engineering of the plant, civil and electro-mechanical installation works, test and commissioning works, and training of the Employer’s staff.

853 MW Ic Anadolu Combined Cycle Power Plant

Construction of a Combined Cycle Power Plant (CCPP) in Kırıkkale, Turkey with a total power output of 853 MW is realized for İç Anadolu Doğalgaz Elektrik Üretim ve Ticaret A.Ş. is implemented on a turnkey basis.

GE STAG 209 9FB MS, is used in the power plant which is designed for 30 years lifespan. GAMA Power Systems and GE Energy as consortium undertakes the responsibility of supply and erection of 2 GE 9FB gas turbines, 1 GE steam turbines, 2 Doosan HRSG’s, Air Cooled Condenser, 380 kV HV switchyard as well as all balance of plant equipment under an EPC contract. Within this scope, basic & detail design of the power plant, civil works, structural, electro mechanical works, erection, installation of electrical, instrumentation & control systems, test and commissioning, start-up works and training of the Employer’s personnel performed in the course of project.

İç Anadolu Combined Cycle Power Plant generates about 6,300 GWh Energy which corresponds 2.5% of total national Energy consumption and almost 50% of Ankara’s energy consumption.

870 MW Erzin Combined Cycle Power Plant

EPC Contract for 870 MW Erzin Combined Cycle Power Plant is implemented on a turnkey basis.

Combined cycle power plant in one multi-shaft arrangement. Power plant is comprised of two GE 209FB gas turbine, Skoda MTD60 steam türbine, three GE 330H generator, with associated Doosan Heat Recovery Steam Generators.

EPC Contract’s scope covers procurement of all major equipment as well as other auxiliary equipment, and conceptual and detail engineering of the plant, civil and electro-mechanical installation works, test and commissioning works and training of the Employer’s staff.

Marmaray Project, Bosphorus Railway Crossing Tunnel Construction

General Directorate of Infrastructure Investments of Republic of Turkey, Ministry of Transport, Maritime Affairs and Communications, awarded the contract for the construction of the 1st phase of Marmaray Project, Railway Bosphorus Tube Crossing, Tunnels and Stations to Taisei-GAMA-Nurol Joint Venture (TGN). GAMA has a share of 12.5% within the Joint Venture.

  • Length of Project alignment: 76.3 km
  • Underground section of the alignment: (between Ayrılıkçeşme-Yedikule) 13.6 km
  • Total number of stations on the alignment: 40 (37 above ground, 3 underground stations)
  • Number of stations suitable for transfer to other railway systems: 4
  • Transfer stations for intercity trains: 8
  • Tracks between Gebze-Ayrılıkçeşme and Kazlıçeşme-Halkalı: 3
  • Tracks between Ayrılıkçeşme-Kazlıçeşme: 2
  • Number of passengers in one direction: 75,000
  • Length of immersed tube tunnel: 1,387 m
  • Deepest point in the immersed tube tunnel alignment: 60.46 m
  • Minimum curve radius in the alignment: 300 m
  • Maximum vertical track gradient: 1.8 %
  • Design speed: 100 km/hour
  • Platform length: 225 m
  • Average distance between stations: 1.9 km
  • Headway between train operations in the alignment: 2 minutes

16.5 MW Cakirlar Run of River Hydroelectric Power Plant

GAMA Renewable Energy Systems Construction Co. (GAYES), a subsidiary of GAMA, executed the project as the enginering, procurement and construction contractor.

With the altitude of 1,400 m – 930 m, run of the river type hydroelectric power plant project has 2×8.25 MW pelton turbines. Electromechanical equipments are provided by VAtech – STE – Indar Consortium on a turn-key basis.

Power Plant is delivered to the Owner with fully operational condition. In addition, GAMA Renewable Energy Systems assisted & managed relations with public & state authorities for the permits and licences on behalf of the Owner/Investor during the construction period.

36.4 MW Lamas Run of River Hydroelectric Power Plant

EPC Contract for 36.4 MW Lamas Run of River Hydroelectric Power Plant is undertaken on a turnkey basis.

With the altitude of 654 m – 80 m, run of the river type hydroelectric power plant project has 2×7.39 MW and 2×10,81 MW pelton turbines.

Isdemir – 6 & 7 Steam Boiler Project

Engineering, procurement, fabrication and installation of two steam boilers with a capacity of 250 ton/hr at the İskenderun Iron and Steel Works Company.

TUPRAS Kırıkkale Refinery Diesel Desulphurisation and CCR Reformer

GAMA is responsible for the civil construction, structural steel fabrication and erection, reinforced concrete and structural steel buildings (design + material + labour), equipment erection, pipe erection, painting and insulation works, electrical and instrumentation works and pre-commissioning works of the NHT Revamp, Reformer, Catalyst Regeneration, Benfree, Flare, Condensate Recovery, Process & Utility, Yard Line and Tankage Area, Hydrojen Presurrising & Storage units and Control, Substation and Analyzer buildings.