Construction and erection of 4×25 MW steam boilers and balance of plant.
GAMA constructed Units 1 & 2 as subcontractor to Babcock and Wilcox (U.S.A), and Units 3 & 4 under direct contract to the Cukurova Electricity Company.
Construction and erection of 4×25 MW steam boilers and balance of plant.
GAMA constructed Units 1 & 2 as subcontractor to Babcock and Wilcox (U.S.A), and Units 3 & 4 under direct contract to the Cukurova Electricity Company.
Construction of Istanbul Metro Project 1st Phase – 1st Part, 3.4 km long Mecidiyeköy – 4. Levent line with 3 stations is implemented.
Turnkey construction and installation of Heating Centre and Heat Distribution System for 6,000 Houses in Eryaman Public Settlement Area.
The detail project engineering and procurement engineering management contracting of the Maleic Anhydrite plant, which is planned to have an annual production capacity of 50,000 tons, was undertaken by GAMA Industry. The project will be built in Gebkim – Kocaeli Gebze V (Chemical) Specialized Organized Industrial Zone. The project is planned to be completed in 17 months.
The construction works and procurement of products and services for the İzmir Bayraklı Integrated Health Campus Project, tendered by the Ministry of Health of the Republic of Turkey under the Public-Private Partnership (PPP) projects, have been undertaken by İzmir Bayraklı Hospital Investment and Health Services Inc. The Engineering, Procurement, and Construction (EPC) contract for the project was signed between İzmir Bayraklı Hospital Investment and Health Services Inc. (SPV) and the Türkerler-GAMA Ordinary Partnership.
The İzmir Bayraklı City Hospital, with a construction partnership of 50% by GAMA Industry, started its services on October 16, 2023. The integrated health facility, covering 628,000 square meters of closed area, consists of six hospitals, including General Hospital, Main Hospital, Maternity and Children’s Hospital, Cardiovascular Surgery Hospital, Oncology Hospital, and High-Security Forensic Psychiatry Hospital, with a total of 2060 patient beds.
As the largest hospital in the Aegean Region, İzmir Bayraklı City Hospital features 337 clinics, 54 operating rooms, 7 catheterization laboratories, 30 dialysis beds, and 50 chemotherapy chairs. The design features of the modern healthcare facility, high construction standards, and the infrastructure of medical and information technology make it an international example. Approximately 1300 seismic isolators were used in the integrated health facility.
EPC Contract for Hamitabat 1200 MW Natural Gas Combined Cycle Power Plant is implemented on a turnkey basis.
The Plant is comprised in two units. Each unit is based on a single-shaft configuration, comprising of one gas turbine, one steam turbine, one generator (SGT5-8000H Gas Turbine, SST5-5000 Steam Turbine, SGen5-3000W Generator) and one Heat Recovery Steam Generator. The units are utilizing the existing dry cooling towers as a part of cooling system. Electricity is transferred to the grid via the existing substation which was refurbished.
EPC Contract’s scope covers procurement of all major equipment as well as other auxiliary equipment and conceptual and detail engineering of the plant, civil and electro-mechanical installation works, test and commissioning works, and training of the Employer’s staff.
EPC Contract for 870 MW Erzin Combined Cycle Power Plant is implemented on a turnkey basis.
Combined cycle power plant in one multi-shaft arrangement. Power plant is comprised of two GE 209FB gas turbine, Skoda MTD60 steam türbine, three GE 330H generator, with associated Doosan Heat Recovery Steam Generators.
EPC Contract’s scope covers procurement of all major equipment as well as other auxiliary equipment, and conceptual and detail engineering of the plant, civil and electro-mechanical installation works, test and commissioning works and training of the Employer’s staff.
EPC Contract for 36.4 MW Lamas Run of River Hydroelectric Power Plant is undertaken on a turnkey basis.
With the altitude of 654 m – 80 m, run of the river type hydroelectric power plant project has 2×7.39 MW and 2×10,81 MW pelton turbines.
GAMA Renewable Energy Systems Construction Co. (GAYES), a subsidiary of GAMA, executed the project as the enginering, procurement and construction contractor.
With the altitude of 1,400 m – 930 m, run of the river type hydroelectric power plant project has 2×8.25 MW pelton turbines. Electromechanical equipments are provided by VAtech – STE – Indar Consortium on a turn-key basis.
Power Plant is delivered to the Owner with fully operational condition. In addition, GAMA Renewable Energy Systems assisted & managed relations with public & state authorities for the permits and licences on behalf of the Owner/Investor during the construction period.