Design, manufacture and erection of; 2 x 41 ton/hr steam boilers and 2 x 100 m3 head accumulator.
Country: Turkey
Construction of 2 each 63 km, 5″ diameter Schedule 120 pipeline from Murgul to Hopa.
Erection of the 150,000 tons/ year capacity soda ash plant.
GAMA installed the electrical equipment and instruments for the Synthetic Rubber Plant in Izmit-Turkey.
Engineering, procurement, fabrication and installation of two steam boilers with a capacity of 250 ton/hr at the İskenderun Iron and Steel Works Company.
Turnkey design, supply and construction of a natural gas fired cogeneration plant, comprising two GE frame 6B gas turbine generators (39.5 MW capacity each) and two HRSG’s (each generating 80 tons/hr of medium pressure and 4 tons/hr of low pressure steam), including all auxiliary components are executed.
GAMA Industry performed turnkey construction of Flue Gas Desulphurisation Plant with wet limestone process for 3×210 MW Kemerköy Thermal Power Plant Units I, II & III, consisting of Limestone Handling, Absorbent Preparation, Scrubbing (with 3 ea. Scrubbers), Flue Gas, Gypsum Dewatering & Handling, Utility, Electrical and C&I Systems, including infrastructure and buildings.
GAMA performed construction, manufacturing and erection of 478 MW Marmara Ereğlisi Natural Gas Combined Cycle Power Plant.
The Birecik Dam and Hydroelectric Power Plant is located on the Euphrates river in the South Eastern part of Turkey. Birecik Dam and Hydroelectric Power Plant is located on the Euphrates river in the South Eastern part of Turkey. Dam crest is more than 2.5 km. long and consist of earth embankment dams on the left and right banks of the river, having a concrete gravity dam section in between, which integrates the spillway and the intake structure to the powerhouse. The dam height is 62.5 m. Power house is equipped with six Francis turbines with 112 MW each, with a total capacity of 672 MW. An annual electricity production of about 2.5 billion kWh is anticipated. In addition, the 56 km2 reservoir is planned to be used for irrigation of 70,000 hectares of farmland. The project is implemented on a “finance-built-operate-transfer” bases, with an operation period of 15 years.
This is the first major project in Turkey to be implemented on finance-built-operate-transfer basis.